0912.106.656ttk.jsc.vietnam@gmail.com
TTK Energy

Government offices and public units

Offices use power during office hours: Exactly when the sun shines

Government offices use power mostly from morning to afternoon, with weekends off. Under the revised Power Development Plan VIII (Decision 768/QĐ-TTg of 15 April 2025), the 2030 target is for 50% of office buildings to use self-consumption rooftop solar. Directive 10/CT-TTg of 30 March 2026 pushes this further.

Government office with rows of solar panels on the flat roof

Typical daily load profile

0h6h12h18h23h LoadSolar
Typical load profile for this business type; your own figures come from load metering

Suggested configuration

Package A: Rooftop panels, grid-tied inverter, EMS metering, sized to office-hour load. Add a small battery if priority loads (servers, one-stop service desk) need backup.

Keep in mind

Investment at public agencies follows capital plans and procurement rules. TTK provides surveys and technical files and installs according to the contractor selection result.

Three benefits

Matches working hours

Most panel output is used immediately during office hours.

Metered data for reporting

The EMS records energy by hour and by month for energy-efficiency reporting.

Clear technical file

Survey record, load profile, capacity and expected yield for the agency’s proposal under the rules.

Questions

Where does TTK help an agency?

Roof survey, load metering, proposed capacity and yield, technical file. Installation follows the agency’s contractor selection.

Can a small commune office install solar?

Yes, if the roof has enough area and structure. The web calculator gives a preliminary size from roof area.

Can surplus be sold?

The system is sized to daytime load. Surplus sales follow the rules in force at the time, which TTK checks when preparing the file.

Estimate for your case

Estimate your savings

Request a survey

Up to 5 fields. TTK uses them only to contact you about your request.

CallZaloRequest a survey